Features & Highlights

Pilbara Pump Fish

AGE Developments has a wealth of down hole fishing success due to its highly skilled team, ever improving fishing tools and real time CCTV camera equipment.

A Pilbara mine site approached AGE to retrieve a pump assembly lost down hole, during an attempted pump removal. Pump assembly included a 9 ½” pump and 10” shroud supported by 6” layflat pump column with multiple 32mm poly lines, dip tape and associated electrical cables. The bore is constructed of 12” slotted steel casing to a total depth of 128 metres.

Read more.